Abuja Thermal Power Station is a 1,350 MW -fired thermal power plant under construction in . The project is an (Nigerian National Petroleum Corporation) flagship power projects along the corridor. This is part of the 3,600MW cumulative power capacity which includes Kaduna IPP (900MW) and Kano IPP (1,350MW). The project will be delivered in collaboration with General Electric (GE) as the Original Equipment Manufacturer (OEM) and Chi.
Read More Download files